Kendall Hall Water Infiltration Remediation
General Description. The Kendall Hall Water Infiltration project will address various water infiltration issues, including the following:
- Portions of the existing EPDM roof on the 1960’s addition will be replaced. The areas not included in this scope of work are in good condition, and are under warranty.
- The existing slate shingle roof will be replaced with a synthetic slate shingle roof. Existing gutters and downspouts will be replaced.
- The wood fascia trim will be scraped and re-painted.
Design Team. The design and construction administration will be provided by Faridy Veisz Fraytak.
Current Status. The investigative phase submission is due in late July 2008.