Loser Hall Water Infiltration Remediation
General Description. The Loser Water Infiltration project will address various water infiltration issues, including the following:
- Water infiltration at the foundation wall along the paver patio.
Design Team. The design and construction administration will be provided by Faridy Veisz Fraytak.
Current Status. The Investigative Phase documents are due in late July 2008.
