Music Building Water Infiltration Remediation

General Description.  The Music Building Water Infiltration project will address various water infiltration issues, including the following:

  • Water infiltration through the foundation wall at the locker room.
  • Water infiltration through the foundation wall behind, and alongside, the stage.

Design Team.  The design and construction administration will be provided by Faridy Veisz Fraytak.

Current Status. The Investigative Phase documents are due in late July 2008.