April 4, 2005:
 |
Attendance: S.L., E.W., N.V.,
N.T., Dr. Kurland |
 |
Mouse batteries tested
successfully |
 |
Lee-Moore algorithm not working
yet. Will continue to attempt to
fine-tune |
 |
Call Paul Eaton, x.2197, about
borrowing laptop |
 |
Make a travel box for MARV |
 |
Gather supplies |
 |
Buy more batteries |
 |
Send receipt to Leona |
March 29, 2005:
 |
Attendance: S.L., E.W., N.V.,
N.T., Dr. Kurland |
 |
Minivan reservation confirmed |
 |
Inquired about IEEE award; should
be mailed soon |
 |
Confirmed rooms for two nights |
 |
T-shirt sizes confirmed |
 |
Reimbursement paperwork submitted |
 |
Begin working on write-ups |
 |
Eric correction algorithm
fairly robust
1. Still working on navigation algorithm |
 |
Lewis Inquire about maze |
1. Same as last year?
2. Gaps?
3. Center?
March 22, 2005:
 |
Attendance: S.L., E.W., N.V.,
N.T., Dr. Kurland |
 |
Sensors all screwed on; solid |
 |
Ask Titi when to expect award |
 |
Book minivan |
 |
Batteries purchased |
 |
Continue correction algorithm
improvement |
 |
Begin write-ups |
March 3, 2005:
 |
Attendance: S.L., E.W., N.V.,
B.G, N.T., Dr. Kurland |
 |
Purchased more socket adaptors |
 |
Mouse disassembled |
 |
Spare motors delivered |
 |
Parts for PCB delivered |
 |
Will begin testing again later
this week |
 |
Brainstorming session to come up
with any possible scenario in
which MARV could get caught |
 |
IEEE Put new pictures of MARV
in presentation
1. take picture of old mouse |
2. discuss differences
February 22, 2005:
 |
Attendance: S.L., E.W., N.V.,
B.G, N.T., Dr. Kurland |
 |
Mouse moves/senses |
 |
Problems with sensor
configuration |
1. Better configuration has been determined
2. Need to construct new bracketing system
3. Front sensor will now be top-down
 |
PCB made, wrong socket size |
1. Will have re-made
 |
EW and NV will give presentation
to IEEE |
 |
Goal: Finalize
wing-sensor bracketing system by next week |
February 15, 2005:
 |
Attendance: S.L., E.W., N.V.,
B.G, N.T., Dr. Kurland |
 |
Mouse built; no power |
 |
Will commence troubleshooting
phase |
 |
Team was awarded $1000 from IEEE |
1. Send letter of thanks
 |
Goal: Movement
by next week! |
February 8, 2005:
 |
Attendance: S.L., E.W., N.V.,
B.G, N.T., Dr. Kurland |
 |
S.L. |
1. Motor driver and voltage regulator circuit almost complete
 |
E.W. |
1.Can have pcb made if time permits
 |
N.T. |
1. Collars for wheels are turned down and the proper size
2. Casters are delivered and ready
3. Collars will be bolted to wheel
 |
Goal: Mouse due
next week! |
February 1, 2005:
 |
Attendance: S.L., E.W., N.V.,
B.A., Bob Garramone, N.T., Dr. Kurland |
 |
General: |
1. Maze complete!
2. Create test maze
 |
S.L. |
1. Get Gantt chart to Nick V.
2. Voltage regulator board soldered
3. Get pricing for rooms in Buffalo
4. Contact Raymond Nesse about school van options
 |
N.V. |
1. Sensor wing prototype created
 |
E.W. |
1. Driver sockets arrived
2. Continue testing motor drivers when soldered
 |
N.T. |
1. Base re-cut
2. Delrin arrived for posts
3. Castors and collars are ordered
4. Motors and wheels mounted by next week
January 25, 2005:
 |
Attendance: S.L., E.W., N.V.,
B.A., Bob Garramone, N.T., Dr. Kurland |
 |
S.L. - Get in contact with IEEE
at Buffalo and inquire about
travel expenses |
 |
ALL Goals: |
1. Maze Complete by January 31st.
2. Mouse complete by February 14th.
 |
N.V. and N.T. meeting on Friday
at 11am for sensor wing design |
 |
S.L. - Get E.W. chip sockets as
soon as they arrive |
 |
N.T. - Chassis needs to be
reshaped. |
 |
N.T. Test wheel attachments.
|
------------------------Winter Break------------------------
November 23, 2004:
 |
Attendance: N.T., N.V., E.W., S.L.,
Dr. Limberis, Dr. Kurland, Mitchell
Kleimen |
 |
Chassis update |
1. Mechanical drawings
2. Mounting techniques
 |
Maze need drawings from Ben;
can then cut wood |
 |
Coding |
1. Sample program to test algorithms
2. Flowchart completed for program flow
 |
N.T. provide last years maze
picture |
 |
Motor drivers continue working
on correct output voltage |
 |
Sensor wing layout |
1. 3 options for SP1
2. Use Pro/E for drawings
 |
Realistic Constraints for SP1
written report |
November 16, 2004:
 |
Attendance: N.T., N.V.,
E.W., B.A., S.L., Brian Schlesinger, Dr. Limberis,
Dr. Kurland, Mitchell Kleimen |
 |
N.T. Chassis: |
1. Cutouts will not diminish strength
2. T6061 Aluminum
3. ½ aluminum dowels for risers
4. Wheels: $6 / pair
 |
Justify all mechanical
calculations |
 |
S.L. Talk to Alex M. about maze
components. |
 |
S.L. purchase dip sockets for
motor drivers |
 |
N.V. no overlap between
sensors? |
1. Test sensor configurations for optimal sensing
 |
Reports due to S.L. by November
28th (Sunday) |
 |
Practice sessions: |
1. Dec 3rd at 11:30am
2. Dec 7th at 11:30am
November 9, 2004:
 |
Attendance: N.T., E.W., S.L., B.A, K.J.
(Ken Johnson), Dr. Kurland, Dr. Limberis |
 |
Circular
chassis problems |
1. Holes will
make structure weaker
2. Possibility of
building regular chassis then just surrounding by a circular ring?
 |
Motor
drivers |
1. Stepping
correctly
2. Need a
soldering adaptor
 |
Sensor wing
must be under 25 cm wide |
 |
Ask Titi if
he received our proposal! |
 |
Make circuit
diagram for motor drivers (5V), motor (6.4V), and sensor (5V) voltage
regulators |
 |
Drawings are
made for maze pieces |
 |
Remember to
bring tools to competition to measure maze |
November 2, 2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Ben A |
 |
Access key is available |
1. 2 people in lab at all times
2. Lock door upon leaving
 |
Updates: |
1. Voltage regulators shipping (free samples)
2. Plexiglass sample available
3. IEEE proposal submitted
4. SP1 Technical Report was good
 |
Sensor Interface |
1. Worked fine
2. Need to finalize front sensor decision
1. Need to price wood at Home Depot
 |
Goals by end of winter break: |
1. Completed Mouse
2. Completed Maze
October 19, 2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland,
Dr. Limberis |
 |
Motors
delivered....delicious. |
 |
Motor
drivers delivered |
 |
Chassis
discussion |
 |
Talk to Alex
M. about cutting wood for maze |
 |
Begin making
tables for SP1 presentations |
 |
Algorithms
are continuing |
 |
Team meeting
set for Wednesday, October 27th at 3pm in AR-148 |
 |
Finalize
IEEE project proposal (2 pages) |
October 12, 2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland,
Dr. Limberis |
 |
Motor
selected from Jameco; ready to order. |
 |
Sensors
delivered |
 |
Preliminary
coding underway |
1.Correction
algorithm
 |
Room access
memo signed |
 |
Begin
voltage regulator research |
 |
Begin
project proposal for IEEE |
 |
Check with
last years team about trip funding |
 |
Check if
companys would like logo on our webpage |
October 5, 2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland,
Dr. Limberis |
 |
Microcontrollers delivered and tested. Need new power adaptor. |
 |
Sensors
ordered. |
 |
Motors: |
1.Difficult
time finding right ones
2.Talk to Dave
Ciotti and Mike Mensch
3.Meet this
weekend to finalize search
 |
Batteries
decided on. Check nominal discharge characteristics. |
 |
Website
account finalized |
 |
Room access
granted |
 |
Approach
Alex M. regarding maze construction help |
September 28th,
2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland,
Dr. Limberis, Ben A. |
 |
Motors: (NT) |
1.Difficulty in finding motor drivers
2.Lean towards fabricating our own motor driver
3.Talk to motor manufacturers and suppliers.
 |
IEEE: |
1.Proposal tentatively set for the end of October.
2.
Acknowledge IEEEs generosity
from last year.
 |
Sensors
Settled on sensors. Contacting company about price break. (NV) |
 |
Microcontrollers & Coding: (EW) |
1.MAVRICs ordered on 9/27/2004
2.
Began Lee-Moore algorithm
coding in C.
 |
Batteries
shy away from lithium-ion rechargeables due to availability/price of
charger. (SL) |
 |
Create memo
for continued team lab use. |
 |
Team meeting
set for Wednesday, September 29th @ 6:30pm in General Lab for
editing of progress report PowerPoint. |
September 21st,
2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland,
Dr. Limberis, Ben A. |
 |
Gantt chart
review update design fields. (SL) |
 |
IEEE design
proposal Have short project proposal ready by mid-October for presentation
to IEEE funding board. |
 |
Ask local
IEEE chapter about possible funding. (SL) |
 |
Request loft
in Room 123 be set aside for Micro-Mouse team. |
 |
Microcontroller Settled on MAVRIC microcontroller. Will buy 2 depending
on availability of funds. (EW) |
 |
Sensor
Comparison: (NV) |
1. Agree on threshold sensor in front of mouse to stop from hitting wall.
2.
35-50 mA draw on sensors so
far.
3.
10 degree angle of deflection
desirable.
 |
Motor
selection motors are so far in the $10-$20 range. (NT) |
 |
Begin
drawing up budget. |
 |
Batteries
Rechargeable vs. Disposable. Create cost chart. (SL) |
 |
Went over
Realistic Constraints paper for SP I class |
September 14th, 2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland |
 |
Talk to Dr.
Limberis about hosting this years competition (NV) |
 |
Decided on
Top-Down threshold sensor array placement |
 |
Gantt chart
tasks (SL) |
1.
Design completion
a. Mechanical
Drawings (NT)
2.
Parts selection
a.
Motor Selection (NT)
b. Sensor Selection
6 x threshold, 1 x Distance (NV)
c. Battery
Selection (SL)
 |
Begin C code modules (EW) |
 |
Order Parts (deadline: end Oct/ beginning
Nov) |
 |
Begin Construction by end of semester |
September 9th, 2004:
 |
Attendance: Nick Vertucci, Eric
Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland |
 |
Future meeting scheduled for
Tuesdays at 11:30am. |
 |
Purposes of meetings: 1)
Communication amongst team members and 2) To help Stay on schedule |
 |
Dr. Kurland advised team members
of the grading criteria |
 |
Money available for project
≈ $1,000.00 |
 |
Begin work
on Gantt charts in order to plan out semester's work |
 |
Primary
design consideration: Placement of sensors |
 |
Nick T. to
get copy of last year's Micro-Mouse paper |
 |
Nick V. to
get website up and running |
 |
Eric to
study last year's algorithms and convert to C |
 |
Ask Mary to
put out email asking for undergraduates on team |
 |
Set goal of
First Place at 2005 Micro-Mouse competition |
|