April 4, 2005:

bullet

Attendance: S.L., E.W., N.V., N.T., Dr. Kurland

bullet

Mouse batteries tested successfully

bullet

Lee-Moore algorithm not working yet.  Will continue to attempt to
fine-tune

bullet

Call Paul Eaton, x.2197, about borrowing laptop

bullet

Make a travel box for MARV

bullet

Gather supplies

bullet

Buy more batteries

bullet

Send receipt to Leona

 

March 29, 2005:

bullet

Attendance: S.L., E.W., N.V., N.T., Dr. Kurland

bullet

Minivan reservation confirmed

bullet

Inquired about IEEE award; should be mailed soon

bullet

Confirmed rooms for two nights

bullet

T-shirt sizes confirmed

bullet

Reimbursement paperwork submitted

bullet

Begin working on write-ups

bullet

Eric – correction algorithm fairly robust
                        1. Still working on navigation algorithm

bullet

Lewis – Inquire about maze

                               1. Same as last year?

                               2. Gaps?

                               3. Center?

March 22, 2005:

bullet

Attendance: S.L., E.W., N.V., N.T., Dr. Kurland

bullet

Sensors – all screwed on; solid

bullet

Ask Titi when to expect award

bullet

Book minivan

bullet

Batteries purchased

bullet

Continue correction algorithm improvement

bullet

Begin write-ups

 

March 3, 2005:

bullet

Attendance: S.L., E.W., N.V., B.G, N.T., Dr. Kurland

bullet

Purchased more socket adaptors

bullet

Mouse disassembled

bullet

Spare motors delivered

bullet

Parts for PCB delivered

bullet

Will begin testing again later this week

bullet

Brainstorming session to come up with any possible scenario in
which MARV could get caught

bullet

IEEE – Put new pictures of MARV in presentation
                        1. take picture of old mouse

                               2. discuss differences 
 

February 22, 2005:

bullet

Attendance: S.L., E.W., N.V., B.G, N.T., Dr. Kurland

bullet

Mouse moves/senses

bullet

Problems with sensor configuration

                            1. Better configuration has been determined

                            2. Need to construct new bracketing system

                            3. Front sensor will now be top-down
bullet

PCB made, wrong socket size

                            1. Will have re-made
bullet

EW and NV will give presentation to IEEE

bullet

Goal:    Finalize wing-sensor bracketing system by next week

 

February 15, 2005:

bullet

Attendance: S.L., E.W., N.V., B.G, N.T., Dr. Kurland

bullet

Mouse built; no power

bullet

Will commence troubleshooting phase

bullet

Team was awarded $1000 from IEEE

                            1. Send letter of thanks
bullet

Goal:    Movement by next week!

 

February 8, 2005:

bullet

Attendance: S.L., E.W., N.V., B.G, N.T., Dr. Kurland

bullet

S.L.

                            1. Motor driver and voltage regulator circuit almost complete
bullet

E.W.

                            1.Can have pcb made if time permits
bullet

N.T.

                            1. Collars for wheels are turned down and the proper size

                            2. Casters are delivered and ready

                            3. Collars will be bolted to wheel       
bullet

Goal:    Mouse due next week!



 February 1, 2005:

 
bullet

Attendance: S.L., E.W., N.V., B.A., Bob Garramone, N.T., Dr. Kurland

bullet

General:

                            1. Maze complete!

                            2. Create test maze
bullet

S.L.

                            1. Get Gantt chart to Nick V.

                            2. Voltage regulator board soldered

                            3. Get pricing for rooms in Buffalo

                            4. Contact Raymond Nesse about school van options
bullet

N.V.

                            1. Sensor wing prototype created
bullet

E.W.

                            1. Driver sockets arrived

                            2. Continue testing motor drivers when soldered
bullet

N.T.

                            1. Base re-cut

                            2. Delrin arrived for posts

                            3. Castors and collars are ordered

                            4. Motors and wheels mounted by next week


January 25, 2005:

bullet

Attendance: S.L., E.W., N.V., B.A., Bob Garramone, N.T., Dr. Kurland

bullet

S.L. - Get in contact with IEEE at Buffalo and inquire about
travel expenses

bullet

ALL Goals:

                            1. Maze Complete by January 31st.

                            2. Mouse complete by February 14th.

 
bullet

N.V. and N.T. meeting on Friday at 11am for sensor wing design

bullet

S.L. - Get E.W. chip sockets as soon as they arrive

bullet

N.T. - Chassis needs to be reshaped.

bullet

N.T. – Test wheel attachments.
 

 

------------------------Winter Break------------------------

 

November 23, 2004:

bullet

Attendance: N.T., N.V., E.W., S.L., Dr. Limberis, Dr. Kurland, Mitchell
Kleimen

bullet

Chassis update

                            1. Mechanical drawings

                            2. Mounting techniques

 
bullet

Maze – need drawings from Ben; can then cut wood

bullet

Coding

                            1. Sample program to test algorithms

                            2. Flowchart completed for program flow

 
bullet

N.T. – provide last year’s maze picture

bullet

Motor drivers – continue working on correct output voltage

bullet

Sensor wing layout

                            1. 3 options for SP1

                            2. Use Pro/E for drawings

 
bullet

Realistic Constraints – for SP1 written report

 

November 16, 2004:

bullet

Attendance: N.T., N.V., E.W., B.A., S.L., Brian Schlesinger, Dr. Limberis,
Dr. Kurland, Mitchell Kleimen

bullet

N.T. Chassis:

                            1. Cutouts will not diminish strength

                            2. T6061 Aluminum

                            3. ½” aluminum dowels for risers

                            4. Wheels: $6 / pair

 
bullet

Justify all mechanical calculations

bullet

S.L. – Talk to Alex M. about maze components.

bullet

S.L. – purchase dip sockets for motor drivers

bullet

N.V. – no overlap between sensors?

                            1. Test sensor configurations for optimal sensing

 
bullet

Reports due to S.L. by November 28th (Sunday)

bullet

Practice sessions:

                            1. Dec 3rd at 11:30am
                            2. Dec 7th at 11:30am

 

 

November 9, 2004:

 
bullet

Attendance: N.T., E.W., S.L., B.A, K.J. (Ken Johnson), Dr. Kurland, Dr. Limberis

bullet

Circular chassis problems

                        1. Holes will make structure weaker

                        2. Possibility of building regular chassis then just surrounding by a circular ring?
bullet

Motor drivers

                        1. Stepping correctly

                        2. Need a soldering adaptor
bullet

Sensor wing – must be under 25 cm wide

bullet

Ask Titi if he received our proposal!

bullet

Make circuit diagram for motor drivers (5V), motor (6.4V), and sensor (5V) voltage regulators

bullet

Drawings are made for maze pieces

bullet

Remember to bring tools to competition to measure maze

 

November 2, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Ben A

bullet

Access key is available

                        1. 2 people in lab at all times

                        2. Lock door upon leaving
bullet

Updates:

                        1. Voltage regulators shipping (free samples)

                        2. Plexiglass sample available

                        3. IEEE proposal submitted

                        4. SP1 Technical Report was good
bullet

Sensor Interface

                        1. Worked fine

                        2. Need to finalize front sensor decision
bullet

Microcontroller / Motors – Need to test motor drivers

bulletChassis – Get measurements of various parts to Nick T. for chassis design
bulletMaze – Ben A. to make drawings for Alex M.

                        1. Need to price wood at Home Depot

bullet

Goals by end of winter break:

                        1. Completed Mouse

                        2. Completed Maze

 

October 19, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis

bullet

Motors delivered....delicious.

bullet

Motor drivers delivered

bullet

Chassis discussion

bullet

Talk to Alex M. about cutting wood for maze

bullet

Begin making tables for SP1 presentations

bullet

Algorithms are continuing

bullet

Team meeting set for Wednesday, October 27th at 3pm in AR-148

bullet

Finalize IEEE project proposal (2 pages)

 

October 12, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis

bullet

Motor selected from Jameco; ready to order.

bullet

Sensors delivered

bullet

Preliminary coding underway

                        1.Correction algorithm
bullet

Room access memo signed

bullet

Begin voltage regulator research

bullet

Begin project proposal for IEEE

bullet

Check with last year’s team about trip funding

bullet

Check if company’s would like logo on our webpage

 

October 5, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis

bullet

Microcontrollers delivered and tested.  Need new power adaptor.

bullet

Sensors ordered.

bullet

Motors:

                        1.Difficult time finding right ones

                        2.Talk to Dave Ciotti and Mike Mensch

                        3.Meet this weekend to finalize search
bullet

Batteries decided on.  Check nominal discharge characteristics.

bullet

Website account finalized

bullet

Room access granted

bullet

Approach Alex M. regarding maze construction help

 

September 28th, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis, Ben A.

bullet

Motors: (NT)

                    1.Difficulty in finding motor drivers

                    2.Lean towards fabricating our own motor driver

                    3.Talk to motor manufacturers and suppliers.
bullet

IEEE:

                    1.Proposal tentatively set for the end of October.

                    2. Acknowledge IEEE’s generosity from last year.
bullet

Sensors – Settled on sensors.  Contacting company about price break. (NV)

bullet

Microcontrollers & Coding: (EW)

                   

                    1.MAVRICs ordered on 9/27/2004

                    2. Began Lee-Moore algorithm coding in C.
bullet

Batteries – shy away from lithium-ion rechargeables due to availability/price of charger. (SL)

bullet

Create memo for continued team lab use.

bullet

Team meeting set for Wednesday, September 29th @ 6:30pm in General Lab for editing of progress report PowerPoint.

 

 

September 21st, 2004:

 
bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis, Ben A.

bullet

Gantt chart review – update design fields. (SL)

bullet

IEEE design proposal – Have short project proposal ready by mid-October for presentation to IEEE funding board.

bullet

Ask local IEEE chapter about possible funding. (SL)

bullet

Request loft in Room 123 be set aside for Micro-Mouse team.

bullet

Microcontroller – Settled on MAVRIC microcontroller.  Will buy 2 depending on availability of funds. (EW)

bullet

Sensor Comparison: (NV)

                1. Agree on threshold sensor in front of mouse to stop from hitting wall.

                2. 35-50 mA draw on sensors so far.

                3. 10 degree angle of deflection desirable.
bullet

Motor selection – motors are so far in the $10-$20 range. (NT)

bullet

Begin drawing up budget.

bullet

 Batteries – Rechargeable vs. Disposable.  Create cost chart. (SL)

bullet

Went over Realistic Constraints paper for SP I class

 

September 14th, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland

bullet

Talk to Dr. Limberis about hosting this year’s competition (NV)

bullet

Decided on Top-Down threshold sensor array placement

bullet

Gantt chart tasks (SL)

                    1. Design completion

                           a. Mechanical Drawings (NT)

                    2.  Parts selection

                           a. Motor Selection (NT)

                           b. Sensor Selection – 6 x threshold, 1 x Distance (NV)

                           c. Battery Selection (SL)
bullet

Begin C code modules (EW)

bullet

Order Parts (deadline: end Oct/ beginning Nov)

bullet

Begin Construction by end of semester

 

 

September 9th, 2004:

 

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland

bullet

Future meeting scheduled for Tuesdays at 11:30am.

bullet

Purposes of meetings: 1) Communication amongst team members and 2) To help Stay on schedule

bullet

Dr. Kurland advised team members of the grading criteria

bullet

Money available for project ≈ $1,000.00

bullet

Begin work on Gantt charts in order to plan out semester's work

bullet

Primary design consideration: Placement of sensors

bullet

Nick T. to get copy of last year's Micro-Mouse paper

bullet

Nick V. to get website up and running

bullet

Eric to study last year's algorithms and convert to C

bullet

Ask Mary to put out email asking for undergraduates on team

bullet

Set goal of First Place at 2005 Micro-Mouse competition