October 19, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis

bullet

Motors delivered....delicious.

bullet

Motor drivers delivered

bullet

Chassis discussion

bullet

Talk to Alex M. about cutting wood for maze

bullet

Begin making tables for SP1 presentations

bullet

Algorithms are continuing

bullet

Team meeting set for Wednesday, October 27th at 3pm in AR-148

bullet

Finalize IEEE project proposal (2 pages)

 

October 12, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis

bullet

Motor selected from Jameco; ready to order.

bullet

Sensors delivered

bullet

Preliminary coding underway

                        1.Correction algorithm
bullet

Room access memo signed

bullet

Begin voltage regulator research

bullet

Begin project proposal for IEEE

bullet

Check with last year’s team about trip funding

bullet

Check if company’s would like logo on our webpage

 

October 5, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis

bullet

Microcontrollers delivered and tested.  Need new power adaptor.

bullet

Sensors ordered.

bullet

Motors:

                        1.Difficult time finding right ones

                        2.Talk to Dave Ciotti and Mike Mensch

                        3.Meet this weekend to finalize search
bullet

Batteries decided on.  Check nominal discharge characteristics.

bullet

Website account finalized

bullet

Room access granted

bullet

Approach Alex M. regarding maze construction help

 

September 28th, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis, Ben A.

bullet

Motors: (NT)

                    1.Difficulty in finding motor drivers

                    2.Lean towards fabricating our own motor driver

                    3.Talk to motor manufacturers and suppliers.
bullet

IEEE:

                    1.Proposal tentatively set for the end of October.

                    2. Acknowledge IEEE’s generosity from last year.
bullet

Sensors – Settled on sensors.  Contacting company about price break. (NV)

bullet

Microcontrollers & Coding: (EW)

                   

                    1.MAVRICs ordered on 9/27/2004

                    2. Began Lee-Moore algorithm coding in C.
bullet

Batteries – shy away from lithium-ion rechargeables due to availability/price of charger. (SL)

bullet

Create memo for continued team lab use.

bullet

Team meeting set for Wednesday, September 29th @ 6:30pm in General Lab for editing of progress report PowerPoint.

 

 

September 21st, 2004:

 
bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland, Dr. Limberis, Ben A.

bullet

Gantt chart review – update design fields. (SL)

bullet

IEEE design proposal – Have short project proposal ready by mid-October for presentation to IEEE funding board.

bullet

Ask local IEEE chapter about possible funding. (SL)

bullet

Request loft in Room 123 be set aside for Micro-Mouse team.

bullet

Microcontroller – Settled on MAVRIC microcontroller.  Will buy 2 depending on availability of funds. (EW)

bullet

Sensor Comparison: (NV)

                1. Agree on threshold sensor in front of mouse to stop from hitting wall.

                2. 35-50 mA draw on sensors so far.

                3. 10 degree angle of deflection desirable.
bullet

Motor selection – motors are so far in the $10-$20 range. (NT)

bullet

Begin drawing up budget.

bullet

 Batteries – Rechargeable vs. Disposable.  Create cost chart. (SL)

bullet

Went over Realistic Constraints paper for SP I class

 

September 14th, 2004:

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland

bullet

Talk to Dr. Limberis about hosting this year’s competition (NV)

bullet

Decided on Top-Down threshold sensor array placement

bullet

Gantt chart tasks (SL)

                    1. Design completion

                           a. Mechanical Drawings (NT)

                    2.  Parts selection

                           a. Motor Selection (NT)

                           b. Sensor Selection – 6 x threshold, 1 x Distance (NV)

                           c. Battery Selection (SL)
bullet

Begin C code modules (EW)

bullet

Order Parts (deadline: end Oct/ beginning Nov)

bullet

Begin Construction by end of semester

 

 

September 9th, 2004:

 

bullet

Attendance: Nick Vertucci, Eric Wojcik, Stephen Lewis, Nick Terzulli, Dr. Kurland

bullet

Future meeting scheduled for Tuesdays at 11:30am.

bullet

Purposes of meetings: 1) Communication amongst team members and 2) To help Stay on schedule

bullet

Dr. Kurland advised team members of the grading criteria

bullet

Money available for project ≈ $1,000.00

bullet

Begin work on Gantt charts in order to plan out semester's work

bullet

Primary design consideration: Placement of sensors

bullet

Nick T. to get copy of last year's Micro-Mouse paper

bullet

Nick V. to get website up and running

bullet

Eric to study last year's algorithms and convert to C

bullet

Ask Mary to put out email asking for undergraduates on team

bullet

Set goal of First Place at 2005 Micro-Mouse competition