Custom Oil Co.
Envirotech Consulting, Inc.
H. A. Fernot Company, Inc.
John Artinger, Gen. Contractor
Regal Collections
PediatriCare Associates
Law Offices of James F. Sullivan
Thomas Shadis & Jillian Custodio
Bruce Abate
Gary & Marianne Pettineo
Danielle Pettineo
Thomas & Stephen Babich
Joseph & Joann Custodio
Michael Pettineo
Michael & Sheryl Esler
Edward & Marlaine Gruber
Kevin & Joya Puzio
Jim & Rita Sullivan
Martin & Victoria Lent
A donation has also been
made in loving memory of
Michael "Kiki" Abate
4.18.2007
Vision Testing
Vision
testing was performed today using flour to simulated painted white lines.
4.11.2007
Initial Vision Testing
The vision and line detection system
was tested on grass for the first time using strips of white paper. The vehicle
successfully identified and avoided the lines.
3.24.2007
GPS Testing
The compass and GPS were tested and
work well. Their integration into the path planning was also successful. The
vehicle is able to navigate to specified waypoints.
3.22.2007
Obstacle Testing
All obstacle tests have been completed.
Both single obstacles and switchbacks were tested. A modification was made
to include shorter arcs in the path planning. Once this adjustment was made,
the vehicle successfully navigated these obstacles with ease.
3.2.2007
Detailed Test Plan
The
team has created a detailed test plan that will be completed to verify that
all systems are funcitonal. Also, this plan will ensure that we are able to
compete in the IGVC in June.
2.23.2007
Team Meeting
The SICK LMS is working and has been
coupled with the remaining hardware and software. Also, several smaller projects
have been completed.